Design, construction and maintenance of UGTES
The Uralsk gas turbine power plant was put into operation in April 2011. This is one of the significant projects within the framework of innovative-industrial development of the Republic of Kazakhstan. Its main task is to provide the population and enterprises with electrical and thermal energy.
- Installed electrical power 54 MW
- Volume of electricity generated in 2023 more than 370 000 000 kW
- Volume of heat energy generated in 2023 more than 70 000 Gcal
Location: Uralsk