The Uralsk gas turbine power plant was put into operation in April 2011. This is one of the significant projects within the framework of innovative-industrial development of the Republic of Kazakhstan. Its main task is to provide the population and enterprises with electrical and thermal energy.

  • Installed electrical power 54 MW
  • Volume of electricity generated in 2023 more than 370 000 000 kW
  • Volume of heat energy generated in 2023 more than 70 000 Gcal

 

Location: Uralsk